Results 1 to 3 of 3

Thread: Public Notice - Maclaren Summit Trail Extension

  1. #1
    Member Icebear's Avatar
    Join Date
    Apr 2006
    Location
    Delta Junction
    Posts
    203

    Default Public Notice - Maclaren Summit Trail Extension

    STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND & WATER, SOUTHCENTRAL
    REGION, LAND OFFICE
    550 W 7TH AVE., SUITE 900C ANCHORAGE, AK 99501-3577

    PUBLIC NOTICE Maclaren Summit Trail Extension

    This is a notification that the Southcentral Region Land Office is considering the new construction
    of a trail extending north from the Maclaren Summit Trail. The extension trail will continue to be
    multi-use, including all terrain vehicles (ATVs). This trail is accessed from the Denali Highway at
    approximately Milepost 37.

    Trail Locations Area Plan

    Maclaren Summit Trail Extension
    Township 21 South, Range 7 East, Sections 4 & 5 Fairbanks Meridian
    Township 20 South, Range 7 East, Sections 13, 14, 22, 23, 28, 29, 32, & 33 Fairbanks Meridian
    Township 20 South, Range 8 East, Sections 18, 19, & 20 Fairbanks Meridian
    Tanana Basin Area Plan East Alaska Range Subregion 5C2

    You are invited to review the enclosed trail information and comment. Construction will begin in
    the summer of 2013 if the project is found to be in the best interest of the sate and grant funds
    secured. The construction will consist of 10.5 miles of trail extending north from the Maclaren
    Summit Trail (MP 37 of the Denali Highway) connecting to the Glacier Gap to Sevenmile Lake Trail
    (MP 31.5 of the Denali Highway). Trail will be multi-use, constructed to accommodate ATVs, as well
    as non-motorized users. Trail will be constructed to sustainable design standards. Route map
    attached.

    To submit comments, please write to the Southcentral Region Office. Please direct written comments
    to Jusdi McDonald, or send an email to jusdi.mcdonald@alaska.gov on or before October 11th, 2012 at
    5pm. The purpose of this notice is to gather input before a final decision is made to ensure the
    new trail will be in the best interest of the State of Alaska.

    If you have any questions, please contact Jusdi McDonald at (907) 269-5032 or via
    email jusdi.mcdonald@alaska.gov, Monday thru Friday, 9:00AM-5:30PM.


    summit_trail_extension.jpg Click on the image for a larger photo.

  2. #2
    Member broncoformudv's Avatar
    Join Date
    Apr 2006
    Location
    Anchorage, Alaska
    Posts
    4,670

    Default

    Thanks Icebear!
    http://i123.photobucket.com/albums/o...0junk/reag.jpg

    "People sleep peaceably in their beds at night only because rough men stand ready to do violence on their behalf." - George Orwell

    Before taking any of my advice for granted on here research the legal ramifications thoroughly I am not the Troopers nor am I the Judge that will be presiding over your case/hearing. Please read the hunting and sportfishing regulations and feel free to interpret their meaning on your own.

  3. #3
    Member
    Join Date
    Apr 2006
    Location
    Mat-Su
    Posts
    1,181

    Default

    Does anyone have any 'updated' information on this trail? It would be interesting to see it put in, as long as there were improvements to the parking areas at both ends.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •